MES completed the second largest solar rooftop in Myanmar at 59kWp in Myeik, Tanintharyi Region. When engineered correctly there are no reliability or intermittency issues with solar technology, despite this being next to a dry dockyard on a diesel-powered island grid. Thanks to MES, EAM and Bo Bo engineering for making this happen.
Solar Water Pumps Completed in Shan State
Myanmar Eco Solutions has completed the installation of a solar water pumping system for both Loi Hseng and Kyain Kham villages in Shan State. The project is funded by the Swiss Agency for...
0 Comments